top of page
2.png
BIM/VDC

BIM/VDC promotes R&D to improve dependability, productivity, and innovation at CREM through exhaustive collaboration between our teams. The value of BIM resides in how much the team learns as we create 3D models and the interactions that the models invite.

​

VDC helps meet our project objectives using integrated information before and during construction.

Side-by-side model and construction using 360 images and 3D model:
1.png
9_edited.jpg

We use an RTS, Robot Total Station, to quickly and accurately place our scope.

10.png

Our pre-fabrication shop:

3D model compared to the final result:

bottom of page